Project Actions
Generate documents, use AI to analyze plans, or get a quote.
AI Plan Reader
Upload a floor plan (PDF, JPG, PNG) and the AI will automatically detect rooms and their dimensions. This will replace any existing rooms.
Quick Quote Generator
Generate a full project estimate from a single total area value. This will replace any existing rooms.
Rooms
Configuration
Adjust the default values for all calculations.
e.g., 1 part Cement : 2 parts Sand : 4 parts Ballast
Project Totals
Summary of all required materials.
Total Area
0.00 m²- Total Blocks0 pcs
- Flat Beam Lengths0.00 m
- BRC Rolls0 rolls
Total Slab Concrete0.000 m³
- Cement (50kg bags)0 bags
- Sand0.00 tonnes
- Ballast / Aggregate0.00 tonnes
Timber & Props
- Total 3x2 Length0.00m (0.00 ft)
- Total 6x1 Length0.00m (0.00 ft)
- Total Props0 pcs
BRC roll covers 115.20 m² per roll. Concrete materials include 10% wastage.